Case Studies

  • Home
  • Case Studies Grid
All

WASA Trinidad: San Fernando Waste Water Treatment Plant Pumps

ENGAGE serviced (3) Sulzer Dry Pit Sewage Pumps at WASA San Fernando Sewage Treatment Facility

Valsyan Housing Development: 150,000 Gallon Water Storage Tank

ENGAGE supplied and installed an E-Fusion Epoxy Bolted Steel Water Storage Tank with a of capacity 150,000 US Gallons

WASA Trinidad: Cali Booster Pump Station

The Water & Sewerage Authority (WASA) contracted ENGAGE to design and construct a Booster Pump Station in the California, Phoenix Park Area

Demerara Distillers: Water Treatment Upgrade

ENGAGE was contracted to design and build a complete process water treatment system from raw well water to drinking water. This Project took place in Guyana during 2021.